Speak with one of our experienced engineers

Contact us

Elastotec

BlueScope Steel Port Kembla Image 1

BlueScope Steel Port Kembla

BlueScope steel was formerly a business within BHP Billiton that became and independent company in 2002. With well known brands such as COLORBOND®, ZINCALUME® and GALVABOND® BlueScope provides engineered building solutions to meet a multitude of end uses.

Read More
Nepean Conveyors, Press Release Image 1

Nepean Conveyors, Press Release

Nepean conveyors becomes an Approved Applicator for Elastotec Direct Bond Ceramic Lagging Nepean Conveyors is one of Australia’s most successful suppliers of large scale, fully

Read More
PT Sandvik Lagging Technicians

PT Freeport

Grasberg Mine PT Freeport Indonesia – PROK/Elastotec Hot Vulcanised Ceramic Lagging Case Study. The Grasberg open pit mine is the largest gold mine and the third largest copper mine in the world.

Read More
PT Kembla Coal Terminal

PT Kembla Coal Terminal

In early 2012 Port Kembla Coal Terminal (PKCT) identified a need to refurbish the drive pulleys on their two Stacker Reclaimer units. Included in this refurbishment was replacement of the lagging.

Read More

Let’s talk

If you work in the mining industry, involved in conveyor maintenance, pulley manufacturing, conveyor design and conveyor maintenance, then, we would like to work with you to bring engineered pulley lagging solutions to the industry.